Myanmar/Malaysia-India-Singapore Transit (MIST) Submarine Cable System
Recently, the union environment ministry’s expert appraisal committee (EAC) on Coastal Regulation Zone (CRZ) matters has given its go-ahead for the construction of Myanmar/ Malaysia- India- Singapore Transit (MIST) Submarine Cable System.
About MIST Submarine Cable System
- It has a total length of 8,100km, connecting Singapore, Malaysia, Myanmar, Thailand, India (Mumbai and Chennai).
- It is being executed by the global technology provider NEC Corp.
- This will be the 17th such optical fibre cable system to land in Mumbai, and is expected to be ready for service sometime in 2023.
- Out of the total 8,100km length of the cable system, about ....
Do You Want to Read More?
Subscribe Now
To get access to detailed content
Already a Member? Login here
Take Annual Subscription and get the following Advantage
The annual members of the Civil Services Chronicle can read the monthly content of the magazine as well as the Chronicle magazine archives.
Readers can study all the material since 2018 of the Civil Services Chronicle monthly issue in the form of Chronicle magazine archives.
World Watch
- 1 Sri Lankan President’s Visit to India
- 2 India and Liberia Hold First Foreign Office Talks
- 3 India-China Agree to Strengthen Border Ties
- 4 India-Armenia Talks on Trade and Connectivity
- 5 India-Russia 21st Inter-Governmental Defence Meeting
- 6 India Votes for UNGA Resolution on Gaza Ceasefire
- 7 India to Chair 68th UN Drug Commission
- 8 UN Adopts Historic Treaty to Combat Cybercrime
- 9 Bulgaria and Romania Get Full Membership in Schengen Zone
- 10 UK Officially Joins Trans-Pacific Trade Agreement