Bihar’s First Floating Solar Power Plant
Bihar Renewable Energy Development Agency (BREDA) is set to commission the state’s first two MW floating solar power plant in Darbhanga district.
- The solar power plant will be directly connected to the utility power grid from where power will be supplied to consumers.
- The project is a part of efforts to tap as well as to generate mass awareness about solar energy.
Impact
- Sustainable Development: The floating power plant will help meet two goals: Produce green energy from solar panels and promote fish farming.
- Reducing Carbon Dioxide: It will generate 2.7 million units annually and will help in reducing 64,125 tonnes of ....
Do You Want to Read More?
Subscribe Now
Take Annual Subscription and get the following Advantage
The annual members of the Civil Services Chronicle can read the monthly content of the magazine as well as the Chronicle magazine archives.
Readers can study all the material before the last six months of the Civil Services Chronicle monthly issue in the form of Chronicle magazine archives.
Related Content
- 1 Bharat Cleantech Manufacturing Platform
- 2 Five New Industrial Clusters from India join WEF Initiative
- 3 Logistics Ease Across Different States (LEADS) 2024 Report
- 4 Team Initiative:Boosting Digital Commerce for MSMEs
- 5 Diamond Imprest Authorization Scheme
- 6 National Critical Minerals Mission
- 7 Mutual Credit Guarantee Scheme for MSMEs
- 8 National Manufacturing Mission
- 9 Financialisation of the Economy
- 10 Undercapitalization of Indian Debt Market

- 1 Extension of PM Kisan Sampada Yojana
- 2 REWARD Project
- 3 50th Anniversary of ICRISAT
- 4 Fair and Remunerative Price
- 5 Four Balance Sheet Challenge
- 6 Market Infrastructure Institutions
- 7 Dollar–Rupee Swap Auction
- 8 Vibrant Village Program
- 9 Parvatmala Scheme
- 10 Indian Footwear and Leather Development Programme